Powered By Kitlog Pro v2.0
My RV-8 build
RV-8
All
3-26-2013
< Previous Log Entry
Next Log Entry >
Date:
3-26-2013
Number of Hours:
2.00
Manual Reference:
Page 8-27
Brief Description:
Aft top skin and aft deck
Aft top skin clecoed into position.
Aft deck centred, clamped and clecoed into position.
The F-812B-1 clecoed into position and the outboard holes drilled to #12 and bolts temporarily installed.
Areas to be removed for the stab bars and the F-812 bulkhead assembly marked.
All holes final drileld to #30 and #40.
Skin is flush to the longerons.
Aft skin clecoed into position
Rear deck centred, clamped and drilled.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
452
866
About me
1
1
Avionics
3
4
Canopy
3
6
Electrical
4
6
Empennage
74
120
Engine
6
10
Finishing Kit
2
2
Flying
3
4
Fuselage
147
353
Instruments
2
0
Miscellaneous
14
36
Panel
7
17
Practice Kits
1
1
Tools
6
16
Wings
178
287
Workshop
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.